Cantilever walls are walls that  have a free unsupported excavation. This section examines vertical cantilever walls, the advantages and disadvantages of cantilever excavations and the basic design methods used for cantilever wall analysis. Cantilever walls restrain retained earth by the passive resistance provided by the soil below the excavation. Many engineers use the cantilever wall term to actually describe gravity walls. In reality both gravity and vertical embedded walls types can be categorized as cantilever if no lateral bracing support is provided by means of tiebacks, struts, etc.


xcantilever_excavation_deepex_model.png__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.YiI_1cZTli.webp

Figure: Cantilever excavation in DeepEX software.


In general, the maximum excavation for a cantilever wall can reach up to 6m or 18ft. Deeper cantilever walls have been constructed but these required more expensive wall systems such as T-type diaphragm walls. Cantilever walls offer some advantages:


Advantages of cantilever walls:


  • Cantilever walls offer an unbstructed open excavation

  • Cantilever walls do not require installation of tiebacks below adjacent properties

  • Cantilever walls offer a simpler construction procedure as the construction staging is much simpler.


Disadvantages of cantilever walls:


  • Maximum excavation for cantilever walls is rather limited, typically to 18 ft (6m) maximum.

  • It is generally not recommended to use cantilever walls next to adjacent buildings.

  • Control of lateral wall displacements depends on the mobilization of passive earth resistance.

  • For deeper cantilever excavations the wall stiffness may have to be considerably increase. This can limit the available space within the excavation.



DeepEX Features

DeepEX Features


All software features and capabilities! Review all available design methods and analysis standards!



 

DeepEX Upgrades

DeepEX Upgrades


We continue our research and we introduce new unique features that extend the software capabilities!



 

Training

Training


Get professional training on DeepEX through videos, examples, webinars and online software presentations!



 

Analysis methods for cantilever walls:


Cantilever walls are very often designed with limit equilibrium methods. In this approach, the designer calculates active and passive earth pressures. Water and other surcharges are also applied if applicable. Two methods in Limit Equilibrium analysis are available:


a) Free earth method for cantilever walls:


This is the simplest approach. It requires that the designer only balances the overturning and resisting moments. Active earth pressures are assumed on the retained side and passive earth pressures are typically assumed on the excavation side. The required embedment for a safety factor of 1 is then obtained at the point of zero moment. The limitation of the method is that shear forces are not balanced. As a result, it is recommended that the obtained embedment for FS=1 is multiplied by approximately 1.2 (to obtain the wall embedment for a safety factor of 1).


b) Fixed earth method for cantilever walls:


The fixed earth method offers a more robust approach as it balances both overturning moments and shears. However, analytical solutions for the fixed earth method are limited to very special conditions. The fixed earth method works by finding the critical pivot point about which rotational moments and shear forces balance. This is done by assuming active earth pressures on the excavation side and passive earth pressures on the retained side below the pivot point. Since closed form solutions with the fixed earth method are limited it is recommended that a Winkler spring analysis will typically offer the best results instead of the classical fixed earth solution.


c) Practical recommendations for cantilever walls


To obtain an adequate safety the typical required wall embedment in cantilever walls is in the order of 1.5 times the excavation height. While cantilever walls offer the advantage of an easy excavation the typical maximum depths are in the order of 15 ft or (4.5m). Beyond that depth, stiffer less economical wall sections will be required to limit horizontal wall displacements to tolerable limits. Whie deeper cantilever walls have been successfully used with small sections, their success was often the result of higher observed soil strengths in the field when compared to the typical conservative design values. Horizontal wall movements should be monitored when constructing deeper cantilever walls.


Cantilever Excavation - Soil Mix Walls LEM and NL Analysis


xmodel_20_cantilever_soil_mix_wall.jpg__1170x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.CPOE6tjAzo.webp


Cantilever Sheet Pile Wall Example


xcantilever_sheetpiles_deepex_englishunits_model_2.jpg__1170x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.GgPdqZSC0o.webp


 

Presentations_DeepEX_Cantilever Excavation.png

Need to Design a Cantilever Excavation?


Book a FREE online presentation now!




 

DeepEX - Shoring Design Software

DeepEX - Shoring Design Software


DeepEX is the ultimate software program for design and analysis of Deep Excavations! Design any wall type and support system in the most efficient way!

  • Structural and Geotechnical Design

  • Modern Interactive Interface

  • Model Automatic Optimization

  • Export Reports and Sketches

  • Limit Equilibrium - Non-Linear - Finite Element Analysis

  • 2D Design Sections  - 3D Frame Analysis



 

DeepEx

DeepEx Demo


Structural and Geotechnical design of Deep Excavations.


Try the Full version for free and see how you can design and optimize any deep excavation model in the most efficient way!


Starting at

$ 3750



 

Web Presentation

Web Presentation


Get a Free online presentation! Learn about all software features and capabilities!



 

Purchase DeepEX

Purchase DeepEX


Get the most powerful shoring design software! Customize your version!



 

Software

Software


Review our software programs for geotechnical engineers and contractors!



 




SELECTED POSTS:

Check back soon
Once posts are published, you’ll see them here.
bottom of page